Project Overview:

The overall project consists of the redevelopment of the former Infinity Foods factory site to construct 31 new residential houses and apartments with gardens, public open spaces, car parking and associated infrastructure. This included: 25 open market homes (2, 3 and 4 bed houses) with 6 affordable housing units (all 2 bed apartments).

 

GHPC was appointed as Lead Designer to prepare & co-ordinate the detailed design of the original development as well as the subsequent change of use planning application for conversion of the office accommodation to apartments.

 

GHPC also acted as CDM Co-ordinator and Client CDM Advisor for the whole project.

PORTSLADE2 Design & Technical Services Back to Portfolio Nav 2 left black large

Client:

 

Architect:

 

CDM Co-ordinator /

Client CDM Advisor:

Taylor Wimpey South Thames

 

GHPC Group Ltd

 

GHPC Group Ltd

Design Photo - Large portslade 3 portslade dwg 2 portslade dwg 1 portslade 4

Key Works Phases:

As a brownfield redevelopment site, the overall project involved:

  • Building clearance & asbestos removal

  • Demolition of former factory buildings

  • Construction of site infrastructure, adoptable roads & sewers

  • Upgrade of permanent site entrance

  • Site Remediation

  • off-site drainage works to upgrade the existing drainage network

  • Residential construction works

CDM Services CDM-C Photo - Large H&S File Services GHPC - Construction Support - New (1280x960) TW_LOGO_CMY - Cropped

Key Constraints:

Given the nature of the development site, there were a number of constraints which were taken into consideration in the design & planning phase:

  • Demolition of former factory buildings

  • Significant building clearance & asbestos removal works including potential risks relating to lead,  weil's disease, contamination, sharps, unoccupied buildings etc.

  • Brownfield site - ground contamination issues and underground tanks requiring purging

  • Close proximity to primary school, scout hall and children's playpark

  • Ecological and environmental considerations

  • Off-site works in live highway

  • Deep excavations

  • Existing Electric Gates at site entrance

  • Ground Conditions & some stability issues  in made ground

  • Traffic management challenges in residential area